Keeping Heavy Industry Moving
Discover how power plants, steel mills, and manufacturing plants use Wrysto to structure audits and optimize schedules.
Featured Plant Case Studies
West Grid MW Power Complex
Prior to adopting Wrysto, West Grid managed work permits and lockout tags using physical carbon sheets. Supervisors spent hours signing papers, causing delays on outage dispatches.
Safety clearances required physical checks and handwritten lock tags. MTTR averaged 6.4 hours.
Lockout/Tagout (LOTO) forms compiled digitally. MTTR fell to 4.2 hours with 0 safety incidents.
Plant Profile
- Location: Texas, USA
- Assets: 850+ MW Turbines, pumps, breakers
- Implementation: 6 Days
Automotive Parts Inc.
Automotive Parts Inc. suffered from high inventory variances. Bearings and conveyor belts were consumed during breakdown repairs without being registered, leading to stockouts.
Technicians grabbed spare motor seals and bearings from bins without tracking, leading to stockouts.
QR scanning linked spare parts consumption directly to work orders. Stock variances dropped to 0.
Plant Profile
- Location: Munich, Germany
- Assets: 1,200+ Conveyor components
- Implementation: 8 Days
Global Plant Footprint
Wrysto is deployed in safety-critical manufacturing and energy complexes globally.